IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

619

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1511 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $552 $0 Implemented
UK1511 # 14 Y:2015 14 2015 INSULATE FEEDWATER TANK $1,113 $862 Implemented
OR0656 # 01 Y:2015 01 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,308,919 $1,300,000 Implemented
OR0656 # 02 Y:2015 02 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $188,688 $247,000 Implemented
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,282 $22,500 Implemented
SF0464 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $884 $0 Implemented
SF0464 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,004 $2,118 Implemented
SF0464 # 03 Y:2015 03 2015 ADD AREA LIGHTING SWITCHES $6,212 $2,837 Implemented
WV0502 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $3,350 $724 Implemented
WV0502 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,826 $500 Implemented
WV0502 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $854 Implemented
WV0502 # 03 Y:2015 03 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,681 $18,000 Implemented
WV0502 # 01 Y:2015 01 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,685 $1,000 Implemented
WV0502 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,334 $25,930 Implemented
WV0502 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $812 $2,934 Implemented
SF0459 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $29,918 $5,047 Implemented
SF0459 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $0 Implemented
SF0459 # 06 Y:2015 06 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,360 $14,429 Implemented
SF0459 # 07 Y:2015 07 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,292 $1,945 Implemented
SF0459 # 11 Y:2015 11 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,754 $22,786 Implemented
SF0459 # 12 Y:2015 12 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $58,197 $81,522 Implemented
SF0459 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $24,030 Implemented
SF0459 # 14 Y:2015 14 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,975 $82,916 Implemented
SF0459 # 17 Y:2015 17 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $166,472 $100,519 Implemented