IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0502 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,826 $500 Implemented
WV0502 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $812 $2,934 Implemented
WV0502 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $854 Implemented
UD0836 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,196 Not Implemented
UD0836 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,796 $36 Not Implemented
UD0836 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,689 $7,000 Not Implemented
UD0836 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,847 $32,000 Not Implemented
UD0836 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,178 $1,000 Not Implemented
UD0836 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,960 $1,140 Not Implemented
UD0836 # 07 Y:2011 07 2011 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,875 $15,000 Not Implemented
UD0836 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,572 $99,100 Not Implemented
UD0836 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $25,293 $18,000 Not Implemented
UD0836 # 10 Y:2011 10 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,389 $10,000 Not Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
UM0272 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $5,009 Not Implemented
UM0272 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $3,000 Not Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UD0701 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,896 $4,800 Not Implemented
UD0701 # 16 Y:2004 16 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $261 $125 Not Implemented
UD0701 # 15 Y:2004 15 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $386 $174 Not Implemented
UD0701 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $397 $30 Not Implemented
UD0701 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $3,294 Not Implemented
UD0701 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,315 $16,140 Not Implemented
UD0701 # 11 Y:2004 11 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,373 $146 Not Implemented
UD0701 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,926 $0 Not Implemented