Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0656 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,308,919 | $1,300,000 | Implemented |
OR0656 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $188,688 | $247,000 | Implemented |
OR0656 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,591 | $27,789 | Implemented |
OR0656 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,282 | $22,500 | Implemented |
OR0594 # 03 Y:2012 | 03 | 2012 | Install Anaerobic Digester | $1,369,423 | $3,468,069 | Implemented |
OR0594 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,684 | $7,360 | Implemented |
OR0583 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,663 | $19,592 | Implemented |
OR0583 # 04 Y:2012 | 04 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,078 | $500 | Implemented |
OR0583 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,391 | $3,854 | Implemented |
OR0583 # 06 Y:2012 | 06 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,779 | $6,600 | Implemented |
OR0583 # 01 Y:2012 | 01 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $3,140 | $2,412 | Implemented |
OR0507 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,600 | $0 | Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 04 Y:2006 | 04 | 2006 | KEEP BOILER TUBES CLEAN | $13,700 | $4,000 | Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0501 # 01 Y:2006 | 01 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $119,000 | $200 | Implemented |
OR0501 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $72,600 | $1 | Implemented |
OR0501 # 03 Y:2006 | 03 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $41,300 | $59,700 | Implemented |
OR0501 # 04 Y:2006 | 04 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $31,700 | $105 | Implemented |
OR0501 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $8,560 | $100 | Implemented |
OR0501 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,100 | $0 | Implemented |
OR0479 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,750 | $100 | Implemented |