Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,198
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0610 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,215 | $0 | Implemented |
SF0610 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $12,954 | $0 | Implemented |
SF0610 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $32,003 | $15,909 | Implemented |
SF0610 # 04 Y:2024 | 04 | 2024 | HEAT WATER WITH EXHAUST HEAT | $36,485 | $30,037 | Implemented |
SF0610 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,683 | $31,050 | Implemented |
SF0610 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $8,502 | $10,799 | Implemented |
SF0610 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,191 | $83,238 | Not Implemented |
SF0610 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $85,768 | $772,344 | Not Implemented |
NL0087 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,019 | $768 | n/a |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | n/a |
NL0087 # 06 Y:2023 | 06 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $10,817 | $3,660 | n/a |
NL0087 # 05 Y:2023 | 05 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,616 | $7,640 | n/a |
NL0087 # 04 Y:2023 | 04 | 2023 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,625 | $8,000 | n/a |
NL0087 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $17,666 | $50 | n/a |
NL0087 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $254,315 | $454,461 | n/a |
NL0087 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $491,419 | $1,990,800 | n/a |
SF0606 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,666 | $923,010 | Not Implemented |
SF0606 # 06 Y:2023 | 06 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,028 | $31,579 | Not Implemented |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | Implemented |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | Implemented |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | Implemented |
WM0203 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,100 | $0 | Implemented |
WM0203 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,171 | $17,500 | Not Implemented |