IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0610 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,683 $31,050 Implemented
SF0610 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,215 $0 Implemented
SF0610 # 04 Y:2024 04 2024 HEAT WATER WITH EXHAUST HEAT $36,485 $30,037 Implemented
SF0610 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $8,502 $10,799 Implemented
SF0610 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $12,954 $0 Implemented
SF0610 # 03 Y:2024 03 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $32,003 $15,909 Implemented
SU0513 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,741 $291 Implemented
DL0193 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,358 $3,540 Implemented
UA0227 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,570 $5,639 Implemented
UA0227 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,466 $1,345 Implemented
UA0227 # 04 Y:2020 04 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $65,276 $72,800 Implemented
UF0551 # 02 Y:2020 02 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $537,853 $1,400,000 Implemented
UF0551 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,189 $1,500 Implemented
UF0551 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,032,365 $4,965,000 Implemented
UF0551 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $0 Implemented
UF0551 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,254 $4,938 Implemented
UF0551 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,687 $1,936 Implemented
UF0551 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,520 $30,000 Implemented
UK2001 # 07 Y:2020 07 2020 CLEAN CONDENSER TUBES $4,023 $8,700 Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK2001 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $571 $875 Implemented
UD1015 # 07 Y:2020 07 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,591 $0 Implemented
UD1015 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,267 $0 Implemented
UD1015 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $0 Implemented