IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
Reset
NAICS 31152 Ice Cream and Frozen Dessert Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1018 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,174 $26,600 Not Implemented
UD1018 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Not Implemented
UU0161 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $6,880 Implemented
UU0161 # 01 Y:2020 01 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $43,260 $86,000 Implemented
UU0161 # 02 Y:2020 02 2020 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $22,840 $53,000 Implemented
UU0161 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,315 $7,880 Implemented
UU0161 # 05 Y:2020 05 2020 ISOLATE HOT OR COLD EQUIPMENT $2,460 $9,000 Not Implemented
UU0161 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,370 $5,370 Not Implemented
IP0130 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $537 $396 Implemented
IP0130 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $539 $348 Not Implemented
IP0130 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $1,966 Implemented
IP0130 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $41,119 $18,096 Not Implemented
IP0130 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,236 $208 Implemented
IP0130 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,064 $70 Implemented
IP0130 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $547 $0 Not Implemented
OK1016 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,028 $28,358 Implemented
OK1016 # 07 Y:2019 07 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $485 $636 Implemented
OK1016 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,766 $9,480 Not Implemented
OK1016 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,210 $730 Not Implemented
OK1016 # 06 Y:2019 06 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $885 $4,860 Not Implemented
OK1016 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,330 $0 Implemented
OK1016 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,523 $0 Not Implemented
SU0481 # 08 Y:2019 08 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,126 $15,784 Not Implemented
SU0481 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $2,630 $0 Not Implemented
SU0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,137 $13,202 Implemented