Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
577
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0345 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,734 | $8,430 | Implemented |
UF0345 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $519 | $525 | Implemented |
UF0345 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,882 | $3,496 | Implemented |
IC0081 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $599 | $0 | Implemented |
IC0081 # 02 Y:2004 | 02 | 2004 | INSTALL SET-BACK TIMERS | $2,895 | $159 | Implemented |
IC0081 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,195 | $600 | Implemented |
IC0081 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $347 | $0 | Implemented |
BD0262 # 01 Y:2004 | 01 | 2004 | INSTALL TURBULATORS | $40,923 | $2,400 | Implemented |
BD0262 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,994 | $3,000 | Implemented |
BD0262 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,116 | $8,920 | Implemented |
BD0262 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $3,267 | $1,200 | Implemented |
BD0262 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,261 | $850 | Implemented |
BD0262 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $287 | $286 | Implemented |
BD0262 # 13 Y:2004 | 13 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,000 | $300 | Implemented |
BD0262 # 14 Y:2004 | 14 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,289 | $5,500 | Implemented |
UF0340 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,590 | $48,289 | Implemented |
UF0340 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,480 | $40,000 | Implemented |
UF0340 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,682 | $400 | Implemented |
UF0340 # 08 Y:2004 | 08 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,678 | $7,900 | Implemented |
GT0778 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,032 | $3,228 | Implemented |
GT0778 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $927 | $600 | Implemented |
OK0670 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,120 | $0 | Implemented |
OK0670 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $12,292 | $0 | Implemented |
WV0277 # 02 Y:2003 | 02 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,711 | $1,000 | Implemented |
WV0277 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $61,699 | $29,824 | Implemented |