Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
577
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0573 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,292 | $4,273 | Implemented |
SF0573 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,800 | $266,176 | Implemented |
LE0508 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,328 | $100 | Implemented |
LE0508 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,110 | $10,000 | Implemented |
LE0508 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,625 | $3,000 | Implemented |
LE0508 # 05 Y:2021 | 05 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,407 | $24,000 | Implemented |
MZ0309 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $354,701 | $442,138 | Implemented |
MZ0309 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,736 | $4,920 | Implemented |
MZ0309 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,649 | $4,200 | Implemented |
MZ0309 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,714 | $960 | Implemented |
MZ0309 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $65,174 | $960 | Implemented |
WV0598 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $1,467 | $3,170 | Implemented |
WV0598 # 07 Y:2020 | 07 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $564 | $613 | Implemented |
WV0598 # 06 Y:2020 | 06 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $916 | $1,021 | Implemented |
WV0598 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $7,292 | $6,768 | Implemented |
NL0047 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $41,210 | $15,000 | Implemented |
NL0047 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,600 | $6,024 | Implemented |
NL0047 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,234 | $230 | Implemented |
NL0047 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $1,700 | Implemented |
NL0047 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $1,148 | Implemented |
GT0943 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $3,005 | $563 | Implemented |
GT0943 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $4,323 | $2,678 | Implemented |
GT0943 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,306 | $3,500 | Implemented |
GT0943 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $736 | $1,938 | Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |