Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 311611 | Animal (except Poultry) Slaughtering |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0951 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,904 | $3,000 | Implemented |
OK0951 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,675 | $2,816 | Implemented |
AM0709 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,800 | $13,090 | Implemented |
AM0709 # 01 Y:2016 | 01 | 2016 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $7,770 | $1,520 | Implemented |
AM0709 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $2,314 | $0 | Implemented |
LE0416 # 16 Y:2016 | 16 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $704 | $3,408 | Implemented |
LE0416 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $4,533 | Implemented |
LE0416 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $43,389 | $1,000 | Implemented |
LE0416 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,973 | $9,000 | Implemented |
LE0416 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $85,792 | $97,000 | Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |
UD0899 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $0 | Implemented |
UD0899 # 06 Y:2014 | 06 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,303 | $0 | Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |
CO0678 # 06 Y:2013 | 06 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,240 | $1,500 | Implemented |
CO0678 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $200 | Implemented |
IA0507 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,053 | $13,600 | Implemented |
IA0507 # 09 Y:2013 | 09 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,196 | $10,318 | Implemented |
IA0507 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,483 | $4,993 | Implemented |
IA0507 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $576 | $25 | Implemented |
IA0507 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $792 | $650 | Implemented |
IA0507 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,342 | $1,000 | Implemented |
IA0507 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $9,686 | $7,803 | Implemented |
IA0507 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,933 | $2,826 | Implemented |
IA0507 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,279 | $1,198 | Implemented |