IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 311611 Animal (except Poultry) Slaughtering
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0147 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,581 $16,000 Implemented
MI0147 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,498 $1,750 Implemented
MI0147 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,305 $7,878 Implemented
LL0236 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,322 $4,300 Implemented
LL0236 # 02 Y:2005 02 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,274 $9,000 Implemented
LL0236 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $3,312 $500 Implemented
LL0236 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $300 Implemented
LL0236 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $295 $100 Implemented
LL0231 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,617 $500 Implemented
LL0231 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,216 $750 Implemented
NC0302 # 01 Y:2004 01 2004 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $59,627 $136,000 Implemented
NC0302 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $953 $100 Implemented
NC0302 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $372 $0 Implemented
NC0302 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $5,988 $0 Implemented
UF0345 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,479 $18,128 Implemented
UF0345 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $9,242 $24,500 Implemented
UF0345 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $2,283 $2,910 Implemented
UF0345 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,734 $8,430 Implemented
UF0345 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $519 $525 Implemented
UF0345 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,882 $3,496 Implemented
BD0262 # 01 Y:2004 01 2004 INSTALL TURBULATORS $40,923 $2,400 Implemented
BD0262 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,994 $3,000 Implemented
BD0262 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,116 $8,920 Implemented
BD0262 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,267 $1,200 Implemented
BD0262 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,261 $850 Implemented