Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141
matching recommendationsNAICS | 311611 | Animal (except Poultry) Slaughtering |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0147 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,581 | $16,000 | Implemented |
MI0147 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,498 | $1,750 | Implemented |
MI0147 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,305 | $7,878 | Implemented |
LL0236 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,322 | $4,300 | Implemented |
LL0236 # 02 Y:2005 | 02 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,274 | $9,000 | Implemented |
LL0236 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $3,312 | $500 | Implemented |
LL0236 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $688 | $300 | Implemented |
LL0236 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $295 | $100 | Implemented |
LL0231 # 02 Y:2005 | 02 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,617 | $500 | Implemented |
LL0231 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,216 | $750 | Implemented |
NC0302 # 01 Y:2004 | 01 | 2004 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $59,627 | $136,000 | Implemented |
NC0302 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $953 | $100 | Implemented |
NC0302 # 04 Y:2004 | 04 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $372 | $0 | Implemented |
NC0302 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,988 | $0 | Implemented |
UF0345 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,479 | $18,128 | Implemented |
UF0345 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $9,242 | $24,500 | Implemented |
UF0345 # 03 Y:2004 | 03 | 2004 | ADD AREA LIGHTING SWITCHES | $2,283 | $2,910 | Implemented |
UF0345 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,734 | $8,430 | Implemented |
UF0345 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $519 | $525 | Implemented |
UF0345 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,882 | $3,496 | Implemented |
BD0262 # 01 Y:2004 | 01 | 2004 | INSTALL TURBULATORS | $40,923 | $2,400 | Implemented |
BD0262 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,994 | $3,000 | Implemented |
BD0262 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,116 | $8,920 | Implemented |
BD0262 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $3,267 | $1,200 | Implemented |
BD0262 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,261 | $850 | Implemented |