Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
352
matching recommendationsNAICS | 311611 | Animal (except Poultry) Slaughtering |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0415 # 08 Y:2007 | 08 | 2007 | INSULATE BARE EQUIPMENT | $525 | $635 | Implemented |
IA0415 # 09 Y:2007 | 09 | 2007 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,560 | $740 | Implemented |
IA0415 # 10 Y:2007 | 10 | 2007 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $2,038 | $2,236 | Implemented |
IA0415 # 11 Y:2007 | 11 | 2007 | INSULATE BARE EQUIPMENT | $2,180 | $1,563 | Not Implemented |
MI0147 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,581 | $16,000 | Implemented |
MI0147 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,498 | $1,750 | Implemented |
MI0147 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,305 | $7,878 | Implemented |
MI0147 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,950 | $1,074 | Not Implemented |
MI0147 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $481 | $30 | Not Implemented |
IA0397 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,016 | $4,118 | Not Implemented |
IA0397 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,968 | $71,321 | Not Implemented |
IA0397 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $1,397 | $385 | Not Implemented |
IA0397 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,603 | $1,108 | Not Implemented |
IA0397 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,632 | $60 | Not Implemented |
IA0397 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,105 | $3,000 | Not Implemented |
IA0397 # 07 Y:2006 | 07 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,904 | $140 | Not Implemented |
IA0397 # 08 Y:2006 | 08 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,601 | $1,302 | Not Implemented |
IA0397 # 09 Y:2006 | 09 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,154 | $2,500 | Not Implemented |
IA0397 # 10 Y:2006 | 10 | 2006 | REDUCE EXCESS STEAM BLEEDING | $97,991 | $10,000 | Not Implemented |
UF0384 # 09 Y:2006 | 09 | 2006 | INCREASE EFFICIENCY OF TRUCKS | $2,312 | $0 | Not Implemented |
UF0384 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $25,292 | $72,945 | Not Implemented |
UF0384 # 07 Y:2006 | 07 | 2006 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,857 | $575 | Not Implemented |
UF0384 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $1,524 | $408 | Not Implemented |
UF0384 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,822 | $3,057 | Not Implemented |
UF0384 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,026 | $0 | Not Implemented |