IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
NAICS 311615 Poultry Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0513 # 09 Y:2006 09 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,170 $144 Implemented
AM0513 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $690 Implemented
LL0255 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,638 $1,520 Implemented
LL0255 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $3,853 $1,320 Implemented
LL0255 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $700 Implemented
LL0255 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $747 $69 Implemented
LL0255 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $244 $30 Implemented
IC0115 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,445 $26,134 Implemented
IC0115 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,985 $16,831 Implemented
IC0115 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,680 $65,036 Implemented
IC0115 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $420 Implemented
IC0115 # 06 Y:2006 06 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $54 $284 Implemented
IC0115 # 08 Y:2006 08 2006 REPLACE BOILER $125,042 $193,200 Implemented
IC0115 # 09 Y:2006 09 2006 REDUCE EXCESS STEAM BLEEDING $29,262 $5,000 Implemented
SF0308 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,671 $0 Implemented
SF0308 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,813 $1,512 Implemented
SF0308 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,381 $9,206 Implemented
SF0308 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $1,925 Implemented
OK0670 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,120 $0 Implemented
OK0670 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $12,292 $0 Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented
SU0164 # 07 Y:2003 07 2003 REDESIGN PROCESS $6,861 $270 Implemented
SU0164 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,485 $700 Implemented