IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,542

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $692 $602 Not Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
LS1806 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $100 Not Implemented
LS1806 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11 $9 Not Implemented
LS1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,834 $13,581 Not Implemented
LS1806 # 04 Y:2018 04 2018 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $1,519 $6,300 Not Implemented
UF0515 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $293,173 $1,270,000 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
UA0189 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $21,964 $45,000 Not Implemented
UA0189 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $13,298 $50 Not Implemented
UA0189 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $3,482 $50 Implemented
UA0189 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,745 $5,828 Implemented
UA0189 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,704 $100 Implemented
UA0189 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,357 $3,000 Implemented
GT0910 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $394 $189 Not Implemented
GT0910 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,351 $14,618 Implemented
GT0910 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $541 $1,237 Implemented