IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,542

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0465 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $18,166 $60,710 Not Implemented
SD0465 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,606 $29,550 Not Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented
SD0465 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $200 Implemented
SD0465 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,318 $1,521 Not Implemented
SD0465 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,113 $200 Not Implemented
SD0465 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $402 $1,100 Not Implemented
SF0412 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $315 $0 Not Implemented
SF0412 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,954 $0 Not Implemented
SF0412 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,535 $314 Not Implemented
SF0412 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $806 $275 Not Implemented
SF0412 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,374 $8,843 Not Implemented
SF0412 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $798 $2,121 Not Implemented
SF0412 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,656 $19,110 Not Implemented
LL0359 # 01 Y:2011 01 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $24,918 $64,500 Not Implemented
LL0359 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,575 $400 Implemented
LL0359 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $639 $3,115 Implemented
LL0359 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $602 $385 Implemented
LL0359 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $515 $394 Not Implemented
LL0359 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $514 $623 Not Implemented
LL0359 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $421 $220 Not Implemented
LL0359 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $59 $240 Implemented
BD0396 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,574 $19,000 Not Implemented
BD0396 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $26,133 $39,000 Not Implemented
BD0396 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,092 $30,000 Not Implemented