IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
NAICS 31182 Cookie, Cracker, and Pasta Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0785 # 02 Y:2004 02 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,460 $0 Not Implemented
GT0785 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,870 $0 Implemented
GT0785 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,757 $1,200 Not Implemented
GT0785 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,570 $2,240 Not Implemented
GT0785 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $223 $150 Not Implemented
GT0785 # 07 Y:2004 07 2004 METER WASTE WATER $1,900 $2,500 Not Implemented
GT0785 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $2,500 Implemented
GT0785 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,630 $3,030 Not Implemented
GT0785 # 10 Y:2004 10 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,400 $8,400 Not Implemented
GT0785 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,057 $4,250 Implemented
TA0068 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $400,000 $8,000 Implemented
TA0068 # 02 Y:2004 02 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $82,002 $12,000 Implemented
TA0068 # 03 Y:2004 03 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $32,648 $6,515 Not Implemented
TA0068 # 04 Y:2004 04 2004 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $31,311 $62,000 Not Implemented
TA0068 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $13,130 $3,258 Implemented
TA0068 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,955 $14,400 Implemented
TA0068 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,450 $420 Implemented
TA0068 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $126 Implemented
GT0749 # 01 Y:2003 01 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $233 $0 n/a
GT0749 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $27,457 $0 n/a
GT0749 # 03 Y:2003 03 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $21,000 $8,220 n/a
GT0749 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,596 $238,800 n/a
GT0749 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,035 $0 n/a
GT0749 # 06 Y:2003 06 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,160 $0 n/a
GT0749 # 07 Y:2003 07 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $200,750 $814,000 n/a