Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsNAICS | 31182 | Cookie, Cracker, and Pasta Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0124 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,460 | $2,200 | Not Implemented |
BS0124 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,609 | $1,030 | Not Implemented |
BS0124 # 02 Y:2019 | 02 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $392 | $1,259 | Not Implemented |
BS0124 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,766 | $6,213 | Not Implemented |
MZ0277 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,394 | $440 | Not Implemented |
MZ0277 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,719 | $50,000 | Not Implemented |
MZ0277 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,416 | $4,211 | Implemented |
MZ0277 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,650 | $2,700 | Implemented |
MZ0277 # 05 Y:2019 | 05 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,418 | $1,920 | Not Implemented |
MZ0277 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $55,889 | $160 | Implemented |
MZ0277 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $70,665 | $233,814 | Implemented |
MZ0277 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,816 | $3,021 | Implemented |
MZ0277 # 09 Y:2019 | 09 | 2019 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $409 | $1,200 | Implemented |
LS1806 # 04 Y:2018 | 04 | 2018 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $1,519 | $6,300 | Not Implemented |
LS1806 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,834 | $13,581 | Not Implemented |
LS1806 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11 | $9 | Not Implemented |
LS1806 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $168 | $100 | Not Implemented |
UF0515 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,104 | $23,300 | Implemented |
UF0515 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,829 | $63,355 | Implemented |
UF0515 # 01 Y:2018 | 01 | 2018 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $293,173 | $1,270,000 | Not Implemented |
UF0515 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $512 | Implemented |
UF0515 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,553 | $2,800 | Implemented |
UF0515 # 04 Y:2018 | 04 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $11,421 | $29,224 | Implemented |
UK1505 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,753 | $3,800 | Implemented |
UK1505 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,998 | $0 | Implemented |