IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

752

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
CO0709 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $1,000 Implemented
CO0709 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,560 $500 Implemented
CO0709 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $10,780 Implemented
BD0464 # 02 Y:2015 02 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,746 $20,000 Implemented
BD0464 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $6,685 $3,075 Implemented
BD0464 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,364 $2,900 Implemented
BD0464 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,313 $750 Implemented
BD0464 # 09 Y:2015 09 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $590 $40 Implemented
WV0498 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,058 $1,700 Implemented
WV0498 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,550 $1,000 Implemented
WV0498 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,891 $599 Implemented
WV0498 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $6,111 $6,377 Implemented
WV0498 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $5,821 $864 Implemented
WV0498 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $19,874 Implemented
SF0455 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,214 $210 Implemented
SF0455 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $94,396 $0 Implemented
SF0455 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $638 $280 Implemented
SF0455 # 04 Y:2014 04 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $14,213 $10,295 Implemented
SF0455 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $232,437 $204,574 Implemented
SF0455 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $11,569 Implemented
SF0455 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,151 $3,742 Implemented
SF0455 # 08 Y:2014 08 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $13,254 $19,582 Implemented
SF0455 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,364 $21,937 Implemented
SF0455 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,651 $2,966 Implemented