Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
752
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
WV0610 # 12 Y:2021 | 12 | 2021 | INSULATE BARE EQUIPMENT | $409 | $488 | Implemented |
WV0610 # 11 Y:2021 | 11 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $2,566 | $733 | Implemented |
WV0610 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,654 | $100 | Implemented |
WV0610 # 09 Y:2021 | 09 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,674 | $1,700 | Implemented |
WV0610 # 06 Y:2021 | 06 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,869 | $3,900 | Implemented |
WV0610 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,437 | $2,340 | Implemented |
WV0610 # 04 Y:2021 | 04 | 2021 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,861 | $600 | Implemented |
WV0610 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,994 | $14,525 | Implemented |
DL0187 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,153 | $1,574 | Implemented |
DL0187 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,940 | $5,000 | Implemented |
DL0187 # 02 Y:2021 | 02 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $13,620 | $0 | Implemented |
DL0187 # 01 Y:2021 | 01 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,390 | $0 | Implemented |
WV0602 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,049 | $3,000 | Implemented |
WV0602 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $1,669 | $2,886 | Implemented |
WV0602 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $1,512 | $2,197 | Implemented |
WV0602 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $268 | $1,225 | Implemented |
WV0602 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $263 | $1,060 | Implemented |
WV0602 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $154 | $568 | Implemented |
WV0602 # 10 Y:2020 | 10 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $136 | $570 | Implemented |