IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

752

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0749 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,003 $11,329 Implemented
OR0749 # 04 Y:2022 04 2022 REPLACE BOILER $122,100 $1,640,000 Implemented
OR0744 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $2,348 $0 Implemented
OR0744 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $15,238 $36,792 Implemented
OR0744 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,963 $2,340 Implemented
OR0744 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,065 $18,105 Implemented
WV0610 # 12 Y:2021 12 2021 INSULATE BARE EQUIPMENT $409 $488 Implemented
WV0610 # 11 Y:2021 11 2021 DEVELOP A REPAIR/REPLACE POLICY $2,566 $733 Implemented
WV0610 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,654 $100 Implemented
WV0610 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,674 $1,700 Implemented
WV0610 # 06 Y:2021 06 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,869 $3,900 Implemented
WV0610 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,437 $2,340 Implemented
WV0610 # 04 Y:2021 04 2021 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,861 $600 Implemented
WV0610 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,994 $14,525 Implemented
DL0187 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,153 $1,574 Implemented
DL0187 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,940 $5,000 Implemented
DL0187 # 02 Y:2021 02 2021 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $13,620 $0 Implemented
DL0187 # 01 Y:2021 01 2021 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,390 $0 Implemented
WV0602 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,049 $3,000 Implemented
WV0602 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,669 $2,886 Implemented
WV0602 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,512 $2,197 Implemented
WV0602 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $268 $1,225 Implemented
WV0602 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $263 $1,060 Implemented
WV0602 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $154 $568 Implemented
WV0602 # 10 Y:2020 10 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $136 $570 Implemented