IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0514 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,432 $0 Implemented
UF0514 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,693 $6,775 Implemented
UF0514 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,154 $30,844 Implemented
UF0514 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,847 $20,000 Implemented
UF0514 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $4,320 $0 Implemented
UF0514 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,740 $2,882 Implemented
UU0126 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,838 $3,980 Implemented
UU0126 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,358 $90 Implemented
UU0126 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,423 $2,000 Implemented
GT0908 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,538 $61,313 Implemented
GT0908 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,577 $578 Implemented
GT0908 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,412 $125 Implemented
GT0908 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $44,491 $135,000 Implemented
IP0088 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $558 $90 Implemented
IP0088 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $945 $750 Implemented
IP0088 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,562 $3 Implemented
GT0905 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $8,865 Implemented
GT0905 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $2,333 $700 Implemented
NC0598 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $932 $100 Implemented
NC0598 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $165 $547 Implemented
NC0598 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,448 $18,822 Implemented
TT0190 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $88 $200 Implemented
MZ0226 # 06 Y:2017 06 2017 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $414 $220 Implemented
MZ0226 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,081 $4,960 Implemented
MZ0226 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,988 $1,115 Implemented