Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
457
matching recommendationsNAICS | 31191 | Snack Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
MZ0226 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,015 | $5,450 | Implemented |
MZ0226 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,166 | $0 | Not Implemented |
MZ0226 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,988 | $1,115 | Implemented |
MZ0226 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,081 | $4,960 | Implemented |
MZ0226 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,703 | $1,760 | Implemented |
MZ0226 # 06 Y:2017 | 06 | 2017 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $414 | $220 | Implemented |
BD0464 # 01 Y:2015 | 01 | 2015 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,126 | $18,000 | Not Implemented |
BD0464 # 02 Y:2015 | 02 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,746 | $20,000 | Implemented |
BD0464 # 03 Y:2015 | 03 | 2015 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $9,022 | $30,000 | Not Implemented |
BD0464 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $6,685 | $3,075 | Implemented |
BD0464 # 05 Y:2015 | 05 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,866 | $20 | Not Implemented |
BD0464 # 06 Y:2015 | 06 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,364 | $2,900 | Implemented |
BD0464 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,313 | $750 | Implemented |
BD0464 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $996 | $700 | Not Implemented |
BD0464 # 09 Y:2015 | 09 | 2015 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $590 | $40 | Implemented |
SF0455 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,214 | $210 | Implemented |
SF0455 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $94,396 | $0 | Implemented |
SF0455 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $638 | $280 | Implemented |
SF0455 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,213 | $10,295 | Implemented |
SF0455 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $232,437 | $204,574 | Implemented |
SF0455 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $11,569 | Implemented |
SF0455 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,151 | $3,742 | Implemented |