Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
254
matching recommendationsNAICS | 311919 | Other Snack Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0877 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $685 | $2,000 | Implemented |
UD0877 # 08 Y:2013 | 08 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $61,182 | $25,000 | Implemented |
UD0877 # 07 Y:2013 | 07 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $262 | $500 | Not Implemented |
UD0877 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,095 | $0 | Implemented |
UD0877 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,183 | $1,000 | Not Implemented |
UD0877 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,143 | $8,200 | Not Implemented |
UD0877 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,981 | $14,250 | Not Implemented |
UD0877 # 01 Y:2013 | 01 | 2013 | ELIMINATE THIRD SHIFT | $75,782 | $0 | Implemented |
OR0596 # 07 Y:2012 | 07 | 2012 | TREAT AND REUSE RINSE WATERS | $48,291 | $10,000 | Implemented |
OR0596 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $80,359 | $51,328 | Not Implemented |
OR0596 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,326 | $6,711 | Not Implemented |
OR0596 # 04 Y:2012 | 04 | 2012 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,274 | $46,450 | Not Implemented |
OR0596 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,779 | $2,217 | Implemented |
OR0596 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,010 | $7,460 | Not Implemented |
OR0596 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,782 | $7,200 | Not Implemented |
NC0448 # 01 Y:2012 | 01 | 2012 | ADOPT IN-HOUSE MATERIAL GENERATION | $42,880 | $75,000 | Not Implemented |
NC0448 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,522 | $100,000 | Not Implemented |
NC0448 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,746 | $5,600 | Implemented |
NC0448 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,740 | $400 | Implemented |
NC0448 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $880 | $200 | Implemented |
AM0601 # 02 Y:2011 | 02 | 2011 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $4,500 | $3,090 | Not Implemented |
AM0601 # 03 Y:2011 | 03 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,800 | $0 | Not Implemented |
AM0601 # 01 Y:2011 | 01 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,600 | $500 | Not Implemented |
AM0601 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,900 | $5,360 | Not Implemented |
AM0601 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $2,020 | $1,360 | Not Implemented |