IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

254

matching recommendations
Reset
NAICS 311919 Other Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0877 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $685 $2,000 Implemented
UD0877 # 08 Y:2013 08 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,182 $25,000 Implemented
UD0877 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $262 $500 Not Implemented
UD0877 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,095 $0 Implemented
UD0877 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,183 $1,000 Not Implemented
UD0877 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,143 $8,200 Not Implemented
UD0877 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,981 $14,250 Not Implemented
UD0877 # 01 Y:2013 01 2013 ELIMINATE THIRD SHIFT $75,782 $0 Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented
OR0596 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,359 $51,328 Not Implemented
OR0596 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,326 $6,711 Not Implemented
OR0596 # 04 Y:2012 04 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,274 $46,450 Not Implemented
OR0596 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,779 $2,217 Implemented
OR0596 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $7,460 Not Implemented
OR0596 # 01 Y:2012 01 2012 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,782 $7,200 Not Implemented
NC0448 # 01 Y:2012 01 2012 ADOPT IN-HOUSE MATERIAL GENERATION $42,880 $75,000 Not Implemented
NC0448 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $19,522 $100,000 Not Implemented
NC0448 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,746 $5,600 Implemented
NC0448 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,740 $400 Implemented
NC0448 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $200 Implemented
AM0601 # 02 Y:2011 02 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $4,500 $3,090 Not Implemented
AM0601 # 03 Y:2011 03 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,800 $0 Not Implemented
AM0601 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Not Implemented
AM0601 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,900 $5,360 Not Implemented
AM0601 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,020 $1,360 Not Implemented