IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
Reset
NAICS 311941 Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0575 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $68,834 $23,508 Implemented
MA0575 # 02 Y:2005 02 2005 $26,800 $41,620 Implemented
MA0575 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $517 Implemented
MA0575 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,944 $7,285 Implemented
MA0575 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $0 Not Implemented
MA0575 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $512 $195 Not Implemented
MA0575 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $233 $30 Not Implemented
IA0359 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,800 $6,352 Not Implemented
IA0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $76 Implemented
IA0359 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,024 $790 Implemented
IA0359 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $3,593 $500 Not Implemented
IA0359 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $518 $30,000 Implemented
IA0359 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $299 $504 Implemented
IA0359 # 07 Y:2005 07 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,436 $1,000 Implemented
IA0359 # 08 Y:2005 08 2005 $3,866 $1,223 Not Implemented
WI0481 # 01 Y:2005 01 2005 $220,500 $28,500 n/a
WI0481 # 02 Y:2005 02 2005 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $187,529 $126,000 Not Implemented
WI0481 # 03 Y:2005 03 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $30,366 $8,400 Not Implemented
WI0481 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,772 $32,176 n/a
WI0481 # 05 Y:2005 05 2005 REPAIR OR REPLACE STEAM TRAPS $6,480 $1,410 Not Implemented
WI0481 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,392 $1,600 Not Implemented
WI0481 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,863 $1,280 Implemented
WI0481 # 08 Y:2005 08 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,275 $5,500 Not Implemented
WI0481 # 09 Y:2005 09 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,080 $500 Implemented
WI0481 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $1,933 $250 Implemented