Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
868
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0533 # 02 Y:2019 | 02 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $5,167 | $1,440 | Implemented |
SF0533 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,254 | $4,129 | Implemented |
SF0533 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,489 | $4,651 | Implemented |
SF0533 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,888 | $3,120 | Implemented |
SF0533 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $292 | $163 | Implemented |
SF0533 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,088 | $25,965 | Implemented |
SF0533 # 09 Y:2019 | 09 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,925 | $3,138 | Implemented |
SF0533 # 10 Y:2019 | 10 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,765 | $2,729 | Implemented |
SF0533 # 11 Y:2019 | 11 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,111 | $11,016 | Implemented |
SF0533 # 12 Y:2019 | 12 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,093 | $93,629 | Implemented |
UU0147 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,081 | $1,800 | Implemented |
UU0147 # 06 Y:2019 | 06 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $130 | $0 | Implemented |
UU0147 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $433 | $400 | Implemented |
UU0147 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM THICKNESS INSULATION | $3,521 | $2,917 | Implemented |
UU0147 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,684 | $7,000 | Implemented |
UU0147 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,746 | $1,200 | Implemented |
UU0146 # 03 Y:2019 | 03 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,780 | $0 | Implemented |
UU0146 # 09 Y:2019 | 09 | 2019 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $97 | $75 | Implemented |
OK0997 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $17,569 | $1,795 | Implemented |
OK0997 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,415 | $2,668 | Implemented |
OK0997 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,238 | $0 | Implemented |
OK0997 # 06 Y:2019 | 06 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,715 | $1,306 | Implemented |
OK0997 # 07 Y:2019 | 07 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,032 | $0 | Implemented |
OK0997 # 08 Y:2019 | 08 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,875 | $0 | Implemented |
OK0997 # 10 Y:2019 | 10 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $366 | $485 | Implemented |