IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

868

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0533 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,167 $1,440 Implemented
SF0533 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,254 $4,129 Implemented
SF0533 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,489 $4,651 Implemented
SF0533 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,888 $3,120 Implemented
SF0533 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $163 Implemented
SF0533 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,088 $25,965 Implemented
SF0533 # 09 Y:2019 09 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,925 $3,138 Implemented
SF0533 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,765 $2,729 Implemented
SF0533 # 11 Y:2019 11 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,111 $11,016 Implemented
SF0533 # 12 Y:2019 12 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,093 $93,629 Implemented
UU0147 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,081 $1,800 Implemented
UU0147 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $130 $0 Implemented
UU0147 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $400 Implemented
UU0147 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $3,521 $2,917 Implemented
UU0147 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $7,000 Implemented
UU0147 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,746 $1,200 Implemented
UU0146 # 03 Y:2019 03 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,780 $0 Implemented
UU0146 # 09 Y:2019 09 2019 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $97 $75 Implemented
OK0997 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $17,569 $1,795 Implemented
OK0997 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,415 $2,668 Implemented
OK0997 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,238 $0 Implemented
OK0997 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,715 $1,306 Implemented
OK0997 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,032 $0 Implemented
OK0997 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $0 Implemented
OK0997 # 10 Y:2019 10 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $366 $485 Implemented