IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

868

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0850 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,844 $1,000 Implemented
SF0596 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,903 $1,551 Implemented
SF0596 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,166 $9,707 Implemented
SF0596 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,982 $4,346 Implemented
SF0596 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $1,185 $2,397 Implemented
IP0166 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,623 $0 Implemented
IP0166 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $33 Implemented
IP0166 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,625 $3,274 Implemented
IP0166 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $1,162 Implemented
IP0166 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $416 Implemented
IP0166 # 10 Y:2022 10 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $665 Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0166 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $665 Implemented
MI0411 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,063 $27,147 Implemented
MI0411 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,028 $0 Implemented
MI0411 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $1,650 Implemented
MI0411 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $630 Implemented
DL0211 # 11 Y:2022 11 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,347 $16,607 Implemented
DL0211 # 08 Y:2022 08 2022 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $3,578 $13,772 Implemented
DL0211 # 06 Y:2022 06 2022 RECOVER AND REUSE COOLING WATER $52,650 $50,000 Implemented
DL0211 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $14,276 $31,550 Implemented
DL0211 # 01 Y:2022 01 2022 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,080 $450 Implemented
AS0529 # 06 Y:2022 06 2022 Install Anaerobic Digester $232,359 $1,128,000 Implemented
AS0529 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $27,045 $300,000 Implemented
AS0529 # 02 Y:2022 02 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,386,000 $40,297 Implemented