IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0407 # 07 Y:2008 07 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $20,238 $21,568 Implemented
UF0407 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,104 $796 Implemented
UF0406 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $17,857 $619 Implemented
UF0406 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,557 $714 Implemented
UF0406 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229,959 $0 Implemented
UF0406 # 09 Y:2007 09 2007 USE OPTIMUM THICKNESS INSULATION $7,084 $1,380 Implemented
DL0008 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $40,014 $14,000 Implemented
DL0008 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,900 $0 Implemented
DL0008 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,801 $175,000 Implemented
DL0008 # 05 Y:2007 05 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $18,000 $1,000 Implemented
DL0008 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,978 $2,105 Implemented
DL0008 # 08 Y:2007 08 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,800 $900 Implemented
DL0008 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $754 $285 Implemented
UM0321 # 03 Y:2007 03 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,993 $1,000 Implemented
UM0321 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,307 $1,000 Implemented
UM0321 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,338 $0 Implemented
UM0321 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $1,558 $5,130 Implemented
UM0319 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,235 $20,000 Implemented
UM0319 # 04 Y:2007 04 2007 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $33,973 $300,000 Implemented
UM0319 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,128 $2,200 Implemented
UM0319 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,223 $86,000 Implemented
AM0527 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $33,106 $56,785 Implemented
AM0527 # 02 Y:2007 02 2007 PAY BILLS ON TIME TO AVOID LATE FEES $28,915 $0 Implemented
AM0527 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $19,815 $27,489 Implemented
AM0527 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $200 $22 Implemented