Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
942
matching recommendationsNAICS | 313 | Textile Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0603 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,643 | $50,038 | Implemented |
NC0603 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $40 | $100 | Implemented |
NC0603 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,607 | $500 | Implemented |
NC0603 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $74 | $240 | Not Implemented |
NC0603 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,221 | $100 | Not Implemented |
NC0603 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $21,836 | $50 | Implemented |
NC0603 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,413 | $100,000 | Not Implemented |
NC0603 # 08 Y:2017 | 08 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,341 | $30,000 | Implemented |
GT0900 # 01 Y:2017 | 01 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,820 | $250 | Implemented |
GT0900 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,671 | $250 | Implemented |
GT0900 # 03 Y:2017 | 03 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,890 | $180 | Implemented |
GT0900 # 04 Y:2017 | 04 | 2017 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $42,468 | $8,000 | Not Implemented |
GT0900 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,980 | $127,113 | Implemented |
GT0900 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $16,527 | $106,785 | Not Implemented |
SD0550 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $526,998 | $1,348,560 | Not Implemented |
SD0550 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $119,615 | $210,000 | Implemented |
SD0550 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,225 | $2,500 | Implemented |
SD0550 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,945 | $600 | Not Implemented |
SD0550 # 05 Y:2017 | 05 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,077 | $9,750 | Not Implemented |
NC0589 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $541 | $300 | Implemented |
NC0589 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
NC0589 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,155 | $66,186 | Implemented |
NC0589 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,357 | $1,000 | Implemented |
NC0589 # 06 Y:2017 | 06 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,876 | $840 | Implemented |
NC0589 # 05 Y:2017 | 05 | 2017 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,593 | $10,750 | Not Implemented |