Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
958
matching recommendationsNAICS | 313 | Textile Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0658 # 02 Y:2020 | 02 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,051 | $15,000 | n/a |
NC0658 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $5,000 | n/a |
NC0658 # 04 Y:2020 | 04 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $92,941 | $500 | n/a |
NC0658 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,952 | $4,258 | n/a |
NC0658 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $400 | n/a |
AS0499 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,180 | $1,532 | Not Implemented |
AS0499 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,118 | $6,351 | Implemented |
AS0499 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,171 | $63 | Implemented |
AS0499 # 04 Y:2021 | 04 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $848 | $607 | Not Implemented |
AS0499 # 05 Y:2021 | 05 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $845 | $2,880 | Not Implemented |
AS0499 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $624 | $2,534 | Not Implemented |
AS0499 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $109 | $394 | Not Implemented |
AS0499 # 08 Y:2021 | 08 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $97 | $80 | Not Implemented |
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |
MA0821 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $997 | $1,400 | Not Implemented |
MA0821 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $23,275 | Not Implemented |
MA0821 # 01 Y:2020 | 01 | 2020 | USE MINIMUM SAFE OVEN VENTILATION | $48,924 | $61,470 | Not Implemented |
LE0487 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $728 | $40 | Implemented |
LE0487 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $5,562 | $1,833 | Implemented |
LE0487 # 03 Y:2020 | 03 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $11,267 | $5,000 | Implemented |
LE0487 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,594 | $10,000 | Not Implemented |
LE0487 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,823 | $10,000 | Implemented |
LE0487 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $399 | $975 | Implemented |
LE0487 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $16,552 | Implemented |
LE0487 # 08 Y:2020 | 08 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,628 | $85,000 | Not Implemented |