IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3131 Fiber, Yarn, and Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0250 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $43,918 $57,938 Implemented
UA0250 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,456 $450 Implemented
UA0250 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,015 $30,617 Implemented
UA0250 # 04 Y:2021 04 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $19,724 $5,000 Implemented
UA0250 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,508 $4,445 Implemented
UA0250 # 02 Y:2021 02 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,021 $25,035 Not Implemented
UA0250 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,394 $34,200 Implemented
UA0245 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,257 $1,579 Not Implemented
UA0245 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $317 $450 Not Implemented
UA0245 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,365 $250 Not Implemented
UA0245 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,374 $22,712 Not Implemented
UA0245 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $323 $197 Not Implemented
UA0245 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,808 $43,308 Not Implemented
WV0614 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,283 $450 Implemented
WV0614 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $37,679 $34,222 Not Implemented
WV0614 # 03 Y:2021 03 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,148 $1,000 Implemented
WV0614 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,396 $38,385 Implemented
WV0614 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $7,526 $5,317 Implemented
WV0614 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,463 $2,884 Implemented
WV0614 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $399,970 $573,165 Not Implemented
WV0614 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,815 $60 Implemented
WV0614 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,124 $1,083 Implemented
LE0514 # 05 Y:2021 05 2021 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $3,549 $13,500 Not Implemented
LE0514 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $1,200 Implemented
LE0514 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,099 $7,600 Implemented