IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
NAICS 3132 Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0313 # 06 Y:2011 06 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,587 $105,000 Implemented
LE0313 # 09 Y:2011 09 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $559 $315 Implemented
AM0583 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,970 $26,490 Implemented
AM0583 # 02 Y:2010 02 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,360 $0 Implemented
AM0583 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,447 $680 Implemented
AM0583 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $500 Implemented
AM0583 # 05 Y:2010 05 2010 PAY UTILITY BILLS ON TIME $479 $0 Implemented
AM0583 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $10 Implemented
AM0583 # 07 Y:2010 07 2010 USE SYNTHETIC LUBRICANT $130 $0 Implemented
UF0422 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,614 $1,161 Implemented
UF0422 # 03 Y:2009 03 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,291 $261 Implemented
UF0422 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,761 $0 Implemented
UF0422 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,882 $26,728 Implemented
MS0334 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,339 $391 Implemented
MA0641 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $3,028 $3,000 Implemented
GT0842 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $5,980 $1,603 Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
MS0310 # 01 Y:2007 01 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,634 $7,425 Implemented
MS0310 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $6,046 Implemented
MS0310 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $144 Implemented
MS0310 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $105 $82 Implemented
GT0819 # 01 Y:2006 01 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $140,000 $10,000 Implemented
GT0819 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,030 $4,800 Implemented