Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
387
matching recommendationsNAICS | 3132 | Fabric Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0300 # 01 Y:2004 | 01 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,985 | $1,000 | Not Implemented |
NC0284 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,310 | $26,200 | Implemented |
NC0284 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,667 | $10,600 | Implemented |
NC0284 # 03 Y:2004 | 03 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,971 | $5,000 | Not Implemented |
NC0284 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,345 | $2,904 | Not Implemented |
NC0284 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $1,002 | Implemented |
NC0284 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $914 | $887 | Not Implemented |
NC0284 # 07 Y:2004 | 07 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $469 | $1,000 | Implemented |
NC0284 # 08 Y:2004 | 08 | 2004 | INSULATE BARE EQUIPMENT | $381 | $528 | Not Implemented |
MA0547 # 01 Y:2004 | 01 | 2004 | CLEAR AND RENT EXISTING SPACE | $200,000 | $398,000 | Not Implemented |
MA0547 # 02 Y:2004 | 02 | 2004 | USE EXISTING DAM TO GENERATE ELECTRICITY | $50,195 | $210,000 | Not Implemented |
MA0547 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,010 | $24,670 | Not Implemented |
MA0547 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,463 | $78,000 | Not Implemented |
MA0547 # 05 Y:2004 | 05 | 2004 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $14,711 | $44,000 | Not Implemented |
MA0547 # 06 Y:2004 | 06 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $14,705 | $4,020 | Not Implemented |
MA0547 # 07 Y:2004 | 07 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $13,419 | $0 | Not Implemented |
MA0547 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,117 | $6,600 | Not Implemented |
MA0547 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,321 | $10,950 | Not Implemented |
MA0547 # 10 Y:2004 | 10 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,829 | $7,475 | Not Implemented |
MA0547 # 11 Y:2004 | 11 | 2004 | ADD AREA LIGHTING SWITCHES | $1,964 | $2,400 | Not Implemented |
MA0547 # 12 Y:2004 | 12 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,376 | $825 | Not Implemented |
MA0547 # 13 Y:2004 | 13 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $349 | $1,400 | Not Implemented |
NC0274 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,125 | $77,500 | Not Implemented |
NC0274 # 02 Y:2003 | 02 | 2003 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $36,152 | $81,000 | Not Implemented |
NC0274 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,209 | $200 | Implemented |