IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

387

matching recommendations
Reset
NAICS 3132 Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0300 # 01 Y:2004 01 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,985 $1,000 Not Implemented
NC0284 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,310 $26,200 Implemented
NC0284 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,667 $10,600 Implemented
NC0284 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,971 $5,000 Not Implemented
NC0284 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,345 $2,904 Not Implemented
NC0284 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $1,002 Implemented
NC0284 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $914 $887 Not Implemented
NC0284 # 07 Y:2004 07 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $469 $1,000 Implemented
NC0284 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $381 $528 Not Implemented
MA0547 # 01 Y:2004 01 2004 CLEAR AND RENT EXISTING SPACE $200,000 $398,000 Not Implemented
MA0547 # 02 Y:2004 02 2004 USE EXISTING DAM TO GENERATE ELECTRICITY $50,195 $210,000 Not Implemented
MA0547 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $43,010 $24,670 Not Implemented
MA0547 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,463 $78,000 Not Implemented
MA0547 # 05 Y:2004 05 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,711 $44,000 Not Implemented
MA0547 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $14,705 $4,020 Not Implemented
MA0547 # 07 Y:2004 07 2004 USE MINIMUM STEAM OPERATING PRESSURE $13,419 $0 Not Implemented
MA0547 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,117 $6,600 Not Implemented
MA0547 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,321 $10,950 Not Implemented
MA0547 # 10 Y:2004 10 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,829 $7,475 Not Implemented
MA0547 # 11 Y:2004 11 2004 ADD AREA LIGHTING SWITCHES $1,964 $2,400 Not Implemented
MA0547 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $825 Not Implemented
MA0547 # 13 Y:2004 13 2004 RECOVER WASTE HEAT FROM EQUIPMENT $349 $1,400 Not Implemented
NC0274 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,125 $77,500 Not Implemented
NC0274 # 02 Y:2003 02 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,152 $81,000 Not Implemented
NC0274 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,209 $200 Implemented