IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 3133 Textile and Fabric Finishing and Fabric Coating Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0014 # 02 Y:2023 02 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,788 $800 n/a
CC0014 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,768 $1,000 n/a
CC0014 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,527 $2,000 n/a
CC0014 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $41,841 $26,106 n/a
CC0014 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,695 $11,000 n/a
CC0014 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,932 $53,322 n/a
CC0014 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 n/a
GT0932 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $4,768 $5,877 Implemented
GT0932 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,606 $1,689 Not Implemented
GT0932 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $495 $382 Implemented
GT0932 # 01 Y:2019 01 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,019 $500 Implemented
GT0932 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $899 $1,117 Implemented
GT0932 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,678 $14,251 Not Implemented
CL1804 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,306 $184,601 Implemented
CL1804 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,335 $15,500 Not Implemented
CL1804 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,409 $3,050 Implemented
CL1804 # 05 Y:2018 05 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,121 $34,121 Not Implemented
CL1804 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156,853 $28,500 Implemented
CL1802 # 05 Y:2018 05 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,710 $250 Not Implemented
CL1802 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,272 $2,080 Not Implemented
CL1802 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,049 $0 Not Implemented
CL1802 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $20,897 Not Implemented
CL1802 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,952 $0 Not Implemented
GT0889 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,925 $1,000 Not Implemented
GT0889 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $14,795 $8,500 Not Implemented