IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3133 Textile and Fabric Finishing and Fabric Coating Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0795 # 08 Y:2004 08 2004 DISCONNECT BALLASTS $1,696 $3,640 Not Implemented
GT0795 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,380 $4,000 Not Implemented
GT0795 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $836 Not Implemented
GT0795 # 05 Y:2004 05 2004 METER WASTE WATER $7,272 $0 Not Implemented
GT0795 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,828 $48,861 Not Implemented
GT0795 # 03 Y:2004 03 2004 USE SYNTHETIC LUBRICANT $30,353 $0 Not Implemented
GT0795 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,201 $34,000 Not Implemented
GT0795 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $43,709 $0 Not Implemented
GT0795 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,570 $2,910 Not Implemented
GT0795 # 09 Y:2004 09 2004 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,125 $6,300 Not Implemented
NC0294 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,084 $2,780 Implemented
NC0294 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,102 $9,225 Implemented
NC0294 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $100 Implemented
NC0294 # 03 Y:2004 03 2004 REDESIGN PROCESS $9,178 $2,200 Not Implemented
NC0294 # 02 Y:2004 02 2004 ADD ADDITIONAL PRODUCTION SHIFT $17,395 $5,000 Not Implemented
MI0087 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,721 $590 Not Implemented
MI0087 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,075 $40 Not Implemented
MI0087 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,320 $14,068 Not Implemented
MI0087 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $300 Not Implemented
MI0087 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,417 $223 Not Implemented
NC0285 # 07 Y:2004 07 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,507 $23,675 Not Implemented
NC0285 # 06 Y:2004 06 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $9,991 $1,000 Not Implemented
NC0285 # 04 Y:2004 04 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $956 $1,380 Not Implemented
NC0285 # 03 Y:2004 03 2004 RECOVER AND REUSE COOLING WATER $29,869 $5,075 Not Implemented
NC0285 # 01 Y:2004 01 2004 RECOVER AND REUSE COOLING WATER $84,488 $67,500 Not Implemented