IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
NAICS 31332 Fabric Coating Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2506 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $51,703 $514,800 n/a
LS2506 # 08 Y:2025 08 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,930 $80,003 n/a
LS2506 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $135 n/a
LS2506 # 02 Y:2025 02 2025 INSTALL OCCUPANCY SENSORS $4,511 $500 n/a
LS2506 # 03 Y:2025 03 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $50 n/a
LS2506 # 04 Y:2025 04 2025 IMPROVE COMBUSTION CONTROL CAPABILITY $24,849 $20,250 n/a
LS2506 # 06 Y:2025 06 2025 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $3,451 $15,964 n/a
LS2506 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,396 $9,990 n/a
UD1085 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,159 $20,475 Not Implemented
UD1085 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,403 $20,475 Not Implemented
UD1085 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $58,447 $0 Not Implemented
UD1085 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,415 $0 Not Implemented
UD1085 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,175 $3,294 Not Implemented
UD1085 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,525 $0 Not Implemented
UD1085 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $1,235 Implemented
UD1085 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $168 $52 Not Implemented
UD1085 # 05 Y:2024 05 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,170 $760 Not Implemented
MA0821 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $490 $1,785 Not Implemented
MA0821 # 01 Y:2020 01 2020 USE MINIMUM SAFE OVEN VENTILATION $48,924 $61,470 Not Implemented
MA0821 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $23,275 Not Implemented
MA0821 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $997 $1,400 Not Implemented
LE0457 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,457 $36,000 Implemented
LE0457 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,689 $13,000 Implemented
LE0457 # 04 Y:2018 04 2018 REPLACE BOILER $33,772 $150,000 Not Implemented
LE0457 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,554 $25,157 Implemented