IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
NAICS 314 Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2313 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,149 $29,920 Implemented
KS2313 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $60 Implemented
KS2313 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $11,545 $33,000 Implemented
UW2301 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $82 $344 Implemented
UW2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,523 $16,133 Implemented
LE0541 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $2,400 Implemented
LE0541 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $4,210 Implemented
LE0541 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,461 $100 Implemented
UL2210 # 02 Y:2022 02 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,394 $0 Implemented
UL2210 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,273 $11,544 Implemented
UL2210 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,208 $0 Implemented
UL2210 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,235 $1,600 Implemented
KS2203 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,941 $13,595 Implemented
KS2203 # 04 Y:2022 04 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $98,216 $570,000 Implemented
KS2203 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,656 $5,480 Implemented
KS2203 # 01 Y:2022 01 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $6,958 $5,101 Implemented
KS2203 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,131 $0 Implemented
KS2203 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,676 $45 Implemented
WV0624 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,241 $6,840 Implemented
WV0624 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,225 $2,763 Implemented
WV0624 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $6,918 $2,242 Implemented
WV0624 # 11 Y:2022 11 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,371 $1,500 Implemented
WV0624 # 16 Y:2022 16 2022 INSULATE BARE EQUIPMENT $3,078 $3,446 Implemented
WV0624 # 13 Y:2022 13 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,157 $6,050 Implemented
WV0624 # 17 Y:2022 17 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $368 $725 Implemented