Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
235
matching recommendationsNAICS | 314 | Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2313 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,149 | $29,920 | Implemented |
KS2313 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,937 | $60 | Implemented |
KS2313 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $11,545 | $33,000 | Implemented |
UW2301 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $82 | $344 | Implemented |
UW2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,523 | $16,133 | Implemented |
LE0541 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $2,400 | Implemented |
LE0541 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $4,210 | Implemented |
LE0541 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,461 | $100 | Implemented |
UL2210 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,394 | $0 | Implemented |
UL2210 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,273 | $11,544 | Implemented |
UL2210 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,208 | $0 | Implemented |
UL2210 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,235 | $1,600 | Implemented |
KS2203 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,941 | $13,595 | Implemented |
KS2203 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $98,216 | $570,000 | Implemented |
KS2203 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,656 | $5,480 | Implemented |
KS2203 # 01 Y:2022 | 01 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,958 | $5,101 | Implemented |
KS2203 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,131 | $0 | Implemented |
KS2203 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $45 | Implemented |
WV0624 # 14 Y:2022 | 14 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,241 | $6,840 | Implemented |
WV0624 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,225 | $2,763 | Implemented |
WV0624 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $6,918 | $2,242 | Implemented |
WV0624 # 11 Y:2022 | 11 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,371 | $1,500 | Implemented |
WV0624 # 16 Y:2022 | 16 | 2022 | INSULATE BARE EQUIPMENT | $3,078 | $3,446 | Implemented |
WV0624 # 13 Y:2022 | 13 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,157 | $6,050 | Implemented |
WV0624 # 17 Y:2022 | 17 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $368 | $725 | Implemented |