IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
SF0588 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $8,477 $5,558 Implemented
SF0588 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $1,515 Implemented
SF0588 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,344 $4,967 Implemented
DL0199 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $1,514 Implemented
DL0199 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,579 $2,106 Implemented
DL0199 # 02 Y:2021 02 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,784 $0 Implemented
DL0199 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,226 $0 Implemented
SF0562 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $26,796 $86,835 Implemented
SF0562 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,226 $2,592 Implemented
SF0562 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,365 $55,965 Implemented
SF0562 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $1,259 $918 Implemented
UU0175 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $31,653 $35,841 Implemented
UU0175 # 03 Y:2021 03 2021 REPLACE BOILER $8,979 $46,872 Implemented
UU0175 # 01 Y:2021 01 2021 ELIMINATE/REDUCE AN OPERATION $154,852 $42,000 Implemented
UU0175 # 05 Y:2021 05 2021 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,532 $6,178 Implemented
UU0171 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $43,211 $85,000 Implemented
UU0171 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $4,000 Implemented
NC0648 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,352 $169,512 Implemented
NC0648 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $907 $1,200 Implemented
NC0648 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $7,874 $10,949 Implemented
NC0648 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $75 Implemented
NC0642 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,383 $500 Implemented
TT0228 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,538 $4,300 Implemented