Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsNAICS | 315 | Apparel Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0792 # 08 Y:2004 | 08 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $39,600 | $32,100 | Not Implemented |
GT0792 # 07 Y:2004 | 07 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,310 | $8,000 | Not Implemented |
GT0792 # 06 Y:2004 | 06 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $41,148 | $96,250 | Not Implemented |
GT0792 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,100 | $75,700 | Not Implemented |
GT0792 # 04 Y:2004 | 04 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $9,228 | $11,000 | Implemented |
GT0792 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,050 | $616 | Implemented |
GT0792 # 02 Y:2004 | 02 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,495 | $3,060 | Implemented |
GT0792 # 01 Y:2004 | 01 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $21,335 | $10,000 | Implemented |
NC0298 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,037 | $1,335 | Implemented |
NC0298 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $219 | $100 | Implemented |
NC0298 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $797 | $1,315 | Not Implemented |
NC0298 # 06 Y:2004 | 06 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,388 | $900 | Implemented |
NC0298 # 05 Y:2004 | 05 | 2004 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $21,805 | $15,800 | Not Implemented |
NC0298 # 04 Y:2004 | 04 | 2004 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,175 | $1,200 | Implemented |
NC0298 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,163 | $800 | Implemented |
NC0298 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,603 | $1,000 | Not Implemented |
NC0298 # 01 Y:2004 | 01 | 2004 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $9,750 | $0 | Implemented |
MI0090 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,398 | $590 | Not Implemented |
MI0090 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,659 | $600 | Not Implemented |
MI0090 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $53,281 | $47,250 | Not Implemented |
MI0090 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,440 | $610 | Not Implemented |
MI0090 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,291 | $6,163 | Not Implemented |
MI0090 # 05 Y:2004 | 05 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,667 | $5,660 | Not Implemented |
MI0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,333 | $112 | Not Implemented |
NC0295 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,285 | $3,200 | Implemented |