IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 321 Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0636 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,929 $16,627 Implemented
NC0636 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $362 $871 Not Implemented
NC0636 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $60 Implemented
NC0636 # 04 Y:2019 04 2019 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $27,892 $85,000 Not Implemented
NC0628 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,628 $15,967 Not Implemented
NC0628 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $785 $1,500 Not Implemented
NC0628 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $200 Implemented
NC0628 # 05 Y:2019 05 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $29,932 $120,000 Not Implemented
NC0628 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $45 $100 Not Implemented
NC0628 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,500 $70,000 Not Implemented
NC0624 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $107 $450 Not Implemented
NC0624 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,704 $24,212 Not Implemented
NC0624 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $200 Not Implemented
NC0624 # 05 Y:2019 05 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,555 $2,000 Not Implemented
NC0624 # 04 Y:2019 04 2019 AVOID REWINDING MOTORS MORE THAN TWICE $39,622 $58,313 Not Implemented
NC0610 # 06 Y:2018 06 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,484 $10,000 Implemented
NC0610 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,172 $200 Implemented
NC0610 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,309 $135,942 Implemented
NC0610 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $100 Not Implemented
NC0610 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $1,350 Not Implemented
NC0610 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,293 $10,000 Implemented
NC0610 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $1,934 $5,865 Implemented
NC0606 # 09 Y:2018 09 2018 REDESIGN PROCESS $31,091 $15,000 Implemented
NC0606 # 08 Y:2018 08 2018 REPAIR OR REPLACE STEAM TRAPS $11,945 $10,500 Implemented
NC0606 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,456 $119,341 Implemented