IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3211 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
CO0648 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $410 Implemented
CO0647 # 03 Y:2011 03 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $950 $600 Implemented
CO0647 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,490 $520 Implemented
OR0572 # 07 Y:2011 07 2011 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,280 $500 Implemented
OR0572 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $4,320 Implemented
OR0572 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $6,860 $3,642 Implemented
WV0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,762 $290 Implemented
WV0432 # 05 Y:2011 05 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,144 $2,000 Implemented
WV0432 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $1,677 $1,775 Implemented
WV0432 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $762 $1,000 Implemented
WV0432 # 12 Y:2011 12 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $207 $25 Implemented
OR0570 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,863 $1,120 Implemented
OR0571 # 04 Y:2011 04 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,906 $7,000 Implemented
OR0571 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,292 $44,400 Implemented
OR0571 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,616 $2,200 Implemented
OR0571 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $13,809 $52,890 Implemented
UW0045 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $1,930 Implemented
UW0045 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $28,362 Implemented
UW0045 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,260 $220 Implemented
UW0044 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,619 $168,530 Implemented
UW0044 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $1,780 Implemented