IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0145 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $3,700 Not Implemented
BS0145 # 04 Y:2021 04 2021 REPAIR OR REPLACE STEAM TRAPS $22,793 $7,115 Not Implemented
BS0145 # 03 Y:2021 03 2021 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $46,312 $106,140 Not Implemented
BS0145 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,250 $6,500 Not Implemented
BS0145 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,842 $306 Not Implemented
BS0122 # 06 Y:2019 06 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $105,689 $93,600 Not Implemented
BS0122 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,341 $1,630 Not Implemented
BS0122 # 07 Y:2019 07 2019 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $322,973 $1,002,400 Not Implemented
BS0122 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,219 $5,725 Not Implemented
BS0122 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $882 $15 Not Implemented
BS0122 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,031 $14,455 Not Implemented
BS0122 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,702 $8,000 Not Implemented
BS0112 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,787 $13,000 Not Implemented
BS0112 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,971 $2,145 Not Implemented
BS0112 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,983 $1,500 Not Implemented
BS0112 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,785 $1,560 Not Implemented
BS0112 # 06 Y:2018 06 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,051 $2,790 Not Implemented
BS0112 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $16,656 $1,031 Not Implemented
BS0109 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,902 $6,720 Not Implemented
BS0109 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,480 $10,867 Not Implemented
BS0109 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,601 $1,491 Not Implemented
BS0109 # 05 Y:2018 05 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $169 $25 Not Implemented
BS0109 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $122 $39 Not Implemented
BS0081 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,309 $150 Implemented
BS0081 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $401 $550 Implemented