Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
714
matching recommendationsNAICS | 321113 | Sawmills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0311 # 11 Y:2005 | 11 | 2005 | INSTALL OCCUPANCY SENSORS | $533 | $2,113 | Not Implemented |
WV0311 # 12 Y:2005 | 12 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $480 | $158 | Implemented |
TA0090 # 01 Y:2004 | 01 | 2004 | CONDENSE OPERATION INTO ONE BUILDING | $91,320 | $20,000 | Not Implemented |
TA0090 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,810 | $64,000 | Not Implemented |
TA0090 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,490 | $45,000 | Not Implemented |
TA0090 # 04 Y:2004 | 04 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $2,350 | $0 | Not Implemented |
TA0090 # 05 Y:2004 | 05 | 2004 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,920 | $120 | Not Implemented |
TA0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $8 | Not Implemented |
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
SU0202 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,315 | $0 | Implemented |
SU0202 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,691 | $150 | Implemented |
SU0202 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,644 | $500 | Implemented |
SU0202 # 04 Y:2005 | 04 | 2005 | USE SYNTHETIC LUBRICANT | $1,315 | $2,000 | Not Implemented |
SU0202 # 05 Y:2005 | 05 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $482 | $1,330 | Not Implemented |
SU0202 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,577 | $30,560 | Implemented |
SU0202 # 07 Y:2005 | 07 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $87,899 | $535,000 | Not Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |
OR0471 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $58,650 | $10,000 | Implemented |
OR0471 # 05 Y:2004 | 05 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $102,700 | $77,400 | Not Implemented |
OR0471 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,000 | $92,000 | Not Implemented |
OR0471 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $18,220 | $20,000 | Not Implemented |
OR0471 # 08 Y:2004 | 08 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,470 | $9,300 | Not Implemented |
OR0471 # 09 Y:2004 | 09 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $6,000 | $1,000 | Implemented |