IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0545 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,200 $58,700 Implemented
OR0545 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $8,600 $35,300 Implemented
UD0794 # 01 Y:2009 01 2009 REDESIGN PROCESS $60,982 $300,000 Not Implemented
UD0794 # 02 Y:2009 02 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $46,758 $0 Not Implemented
UD0794 # 03 Y:2009 03 2009 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,779 $50,000 Not Implemented
UD0794 # 04 Y:2009 04 2009 UPGRADE CONTROLS ON COMPRESSORS $9,841 $10,000 Not Implemented
UD0794 # 05 Y:2009 05 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,981 $19,425 Not Implemented
UD0794 # 06 Y:2009 06 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,273 $1,000 Not Implemented
UD0794 # 07 Y:2009 07 2009 UPGRADE CONTROLS ON COMPRESSORS $3,255 $0 Implemented
UD0794 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,202 $0 Implemented
UD0794 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,000 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 03 Y:2008 03 2008 INSTALL TIMERS AND/OR THERMOSTATS $53,629 $49,236 Not Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 05 Y:2008 05 2008 DEVELOP A REPAIR/REPLACE POLICY $5,057 $0 Not Implemented
UF0416 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,189 $227,490 Not Implemented
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
OR0537 # 01 Y:2008 01 2008 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $34,473 $24,900 Not Implemented
OR0537 # 02 Y:2008 02 2008 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $56,459 $10,000 Not Implemented
OR0537 # 03 Y:2008 03 2008 REDUCE SCRAP PRODUCTION $131,635 $140,000 Not Implemented
OR0537 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $10,283 $27,375 Not Implemented
OR0537 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,386 $18,550 Not Implemented
OR0537 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,113 $0 Implemented
OR0537 # 07 Y:2008 07 2008 USE OPTIMUM THICKNESS INSULATION $11,928 $5,611 Not Implemented