Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
654
matching recommendationsNAICS | 32121 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0610 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,309 | $135,942 | Implemented |
NC0610 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,172 | $200 | Implemented |
NC0610 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,006 | $1,350 | Not Implemented |
NC0610 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $100 | Not Implemented |
NC0610 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,293 | $10,000 | Implemented |
NC0610 # 06 Y:2018 | 06 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,484 | $10,000 | Implemented |
NC0610 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,934 | $5,865 | Implemented |
BS0091 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,778 | $17,240 | Not Implemented |
BS0091 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,806 | $39,830 | Not Implemented |
BS0091 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,201 | $240 | Not Implemented |
BS0091 # 04 Y:2017 | 04 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,685 | $3,100 | Not Implemented |
OR0679 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,613 | $47,385 | Implemented |
OR0679 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $74,285 | $6,200 | Implemented |
OR0679 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,472 | $0 | Implemented |
OR0679 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,003 | $10,369 | Not Implemented |
OR0679 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,513 | $47,575 | Implemented |
OR0679 # 06 Y:2016 | 06 | 2016 | REPLACE BOILER | $48,912 | $250,000 | Not Implemented |
BS0088 # 01 Y:2016 | 01 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,541 | $11,782 | Not Implemented |
BS0088 # 02 Y:2016 | 02 | 2016 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $64,374 | $480 | Not Implemented |
BS0088 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,994 | $29,692 | Not Implemented |
BS0080 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,626 | $8,468 | Not Implemented |
BS0080 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $264 | $417 | Implemented |
BS0080 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $560 | $500 | Implemented |
BS0080 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,926 | $8,600 | Not Implemented |
BS0080 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $414 | $196 | Not Implemented |