Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsNAICS | 32121 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0628 # 05 Y:2019 | 05 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $29,932 | $120,000 | Not Implemented |
NC0628 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $785 | $1,500 | Not Implemented |
NC0628 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,500 | $70,000 | Not Implemented |
NC0628 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $45 | $100 | Not Implemented |
NC0628 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $200 | Implemented |
NC0628 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,628 | $15,967 | Not Implemented |
NC0624 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,403 | $200 | Not Implemented |
NC0624 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $107 | $450 | Not Implemented |
NC0624 # 05 Y:2019 | 05 | 2019 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $9,555 | $2,000 | Not Implemented |
NC0624 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,704 | $24,212 | Not Implemented |
NC0624 # 04 Y:2019 | 04 | 2019 | AVOID REWINDING MOTORS MORE THAN TWICE | $39,622 | $58,313 | Not Implemented |
NC0610 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,309 | $135,942 | Implemented |
NC0610 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,934 | $5,865 | Implemented |
NC0610 # 06 Y:2018 | 06 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,484 | $10,000 | Implemented |
NC0610 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,293 | $10,000 | Implemented |
NC0610 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $100 | Not Implemented |
NC0610 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,006 | $1,350 | Not Implemented |
NC0610 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,172 | $200 | Implemented |
NC0512 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,341 | $100 | Not Implemented |
NC0512 # 03 Y:2014 | 03 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,504 | $22,000 | Not Implemented |
NC0512 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $375 | $1,605 | Not Implemented |
NC0512 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,636 | $43,944 | Not Implemented |
NC0512 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $35,127 | $9,720 | Not Implemented |
NC0512 # 06 Y:2014 | 06 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $36,114 | $73,589 | Not Implemented |
NC0512 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,691 | $50 | Not Implemented |