Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3219 | Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0563 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $951 | $0 | Implemented |
UF0563 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,026 | $406 | Implemented |
UF0563 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,895 | $3,125 | Implemented |
UF0563 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,163 | $0 | Implemented |
UF0563 # 05 Y:2020 | 05 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,582 | $735 | Implemented |
MI0248 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,241 | $1,660 | Implemented |
MI0248 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,449 | $2,300 | Implemented |
MI0248 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,983 | $30,489 | Implemented |
MI0248 # 07 Y:2013 | 07 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,005 | $240 | Implemented |
MI0248 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,180 | $80 | Implemented |
MI0106 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,390 | $56 | Implemented |
MI0106 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $862 | Implemented |
MI0106 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,418 | $225 | Implemented |
MI0106 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $19,885 | $760 | Implemented |
MI0070 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,397 | $5,248 | Implemented |
MI0070 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,868 | $2,300 | Implemented |
MI0070 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $197,433 | $74,805 | Implemented |
UF0331 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,423 | $0 | Implemented |
UF0331 # 09 Y:2003 | 09 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $2,340 | $2,372 | Implemented |
UF0331 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,000 | $3,000 | Implemented |
UF0331 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Implemented |
UF0331 # 05 Y:2003 | 05 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,190 | $32,481 | Implemented |
UF0331 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $924 | $1,649 | Implemented |
UF0331 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,837 | $11,405 | Implemented |
UF0331 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,357 | $18,567 | Implemented |