IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,548

matching recommendations
Reset
NAICS 3219 Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0364 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,347 $7,928 Not Implemented
AS0364 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $221 $524 Not Implemented
AS0364 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $990 $150 Not Implemented
AS0364 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,291 $31,527 Not Implemented
AS0364 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $285 $10 Not Implemented
UF0331 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,357 $18,567 Implemented
UF0331 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,423 $0 Implemented
UF0331 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,837 $11,405 Implemented
UF0331 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $924 $1,649 Implemented
UF0331 # 05 Y:2003 05 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,190 $32,481 Implemented
UF0331 # 06 Y:2003 06 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,275 $55,800 Not Implemented
UF0331 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Implemented
UF0331 # 08 Y:2003 08 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,000 $3,000 Implemented
UF0331 # 09 Y:2003 09 2003 MOVE PRODUCT USING MECHANICAL MEANS $2,340 $2,372 Implemented
AM0444 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,800 $0 Implemented
AM0444 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $460 $200 Implemented
AM0444 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $80 Implemented
AM0444 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $280 $0 Not Implemented
AM0444 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,950 $10,000 Not Implemented
IA0324 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,364 $157 Implemented
IA0324 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $936 $446 Not Implemented
IA0324 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $572 $712 Not Implemented
IA0324 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $124 Implemented
IA0324 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,661 $6,189 Not Implemented
IA0324 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $11,651 $20,000 Not Implemented