Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
971
matching recommendationsNAICS | 32191 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0414 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,787 | $200 | Not Implemented |
UM0414 # 03 Y:2012 | 03 | 2012 | OPTIMIZE PLANT POWER FACTOR | $6,520 | $10,000 | Not Implemented |
UM0414 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $449 | $100 | Not Implemented |
UM0414 # 05 Y:2012 | 05 | 2012 | REDUCE VENTILATION AIR | $9,526 | $0 | Not Implemented |
UM0414 # 06 Y:2012 | 06 | 2012 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,148 | $7,000 | Implemented |
UM0414 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,440 | $10,000 | Not Implemented |
BS0005 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $265 | $555 | Not Implemented |
BS0005 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,970 | $609 | Implemented |
BS0005 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,733 | $178 | Implemented |
BS0005 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,615 | $10,000 | Implemented |
BS0005 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,653 | $7,846 | Not Implemented |
BS0005 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $11,990 | $17,000 | Not Implemented |
OR0590 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,954 | $5,038 | Not Implemented |
OR0590 # 02 Y:2012 | 02 | 2012 | USE OPTIMUM TEMPERATURE | $3,137 | $0 | Implemented |
OR0590 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,188 | $87,787 | Not Implemented |
OR0589 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,386 | $0 | Not Implemented |
OR0589 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,711 | $6,200 | Implemented |
OR0589 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $53,151 | Implemented |
OR0589 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,028 | $43,292 | Not Implemented |
NC0462 # 01 Y:2012 | 01 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $21,080 | $25,000 | Not Implemented |
NC0462 # 02 Y:2012 | 02 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $107,890 | $305,000 | Not Implemented |
NC0462 # 03 Y:2012 | 03 | 2012 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,910 | $20,000 | Not Implemented |
NC0462 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,190 | $400 | Implemented |
NC0462 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $102 | $200 | Implemented |
NC0462 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,686 | $11,000 | Implemented |