IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0104 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,306 $482 Not Implemented
BS0104 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,363 $968 Not Implemented
BS0104 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $5,010 $7,576 Not Implemented
BS0104 # 10 Y:2017 10 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,506 $20,241 Not Implemented
BS0104 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,510 $60,400 Not Implemented
BS0104 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $338 $198 Not Implemented
BS0104 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $444 $990 Not Implemented
BS0104 # 06 Y:2017 06 2017 ELIMINATE/REDUCE AN OPERATION $72 $169 Not Implemented
BS0104 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,223 $948 Not Implemented
BS0104 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $120,755 $55,860 Not Implemented
BS0101 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,830 $20,375 Not Implemented
BS0101 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $660 Not Implemented
BS0101 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,138 $1,400 Not Implemented
BS0101 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $10,844 $25,166 Not Implemented
BS0101 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,143 $525 Not Implemented
BS0101 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,063 $41,435 Not Implemented
BS0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $1,323 Not Implemented
BS0072 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $547 $582 Not Implemented
BS0072 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $240 $413 Not Implemented
BS0072 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,231 $15,400 Not Implemented
BS0072 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $217 $63 Not Implemented
BS0072 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $56 $47 Not Implemented
BS0072 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $48 Not Implemented
BS0072 # 07 Y:2016 07 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,023 $3,260 Not Implemented
BS0056 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,964 $2,208 Not Implemented