Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsNAICS | 321918 | Other Millwork (including Flooring) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0091 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,370 | $1,500 | Implemented |
NL0091 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,330 | $57,285 | Implemented |
NL0091 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $11,473 | Implemented |
WV0655 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $4,078 | $12,517 | Implemented |
WV0655 # 10 Y:2023 | 10 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,641 | $210 | Implemented |
WV0655 # 11 Y:2023 | 11 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $324 | $359 | Implemented |
WV0655 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,350 | $1,500 | Implemented |
WV0655 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,005 | $7,828 | Implemented |
WV0655 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $8,192 | $5,240 | Implemented |
TT0301 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,607 | $0 | Implemented |
TT0301 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,720 | $15,200 | Implemented |
TT0301 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,899 | $1,500 | Implemented |
TT0301 # 05 Y:2023 | 05 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,886 | $220 | Implemented |
LE0501 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,133 | $100 | Implemented |
LE0501 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $985 | $100 | Implemented |
LE0501 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $560 | $500 | Implemented |
LE0501 # 06 Y:2021 | 06 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,632 | $36,000 | Implemented |
IP0131 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,581 | $300 | Implemented |
IP0131 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,356 | $1,500 | Implemented |
IP0131 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,654 | $60,600 | Implemented |
IP0131 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,771 | $31,062 | Implemented |
IP0131 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,109 | $1,524 | Implemented |
TT0215 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $15,764 | $1,150 | Implemented |
SU0453 # 06 Y:2018 | 06 | 2018 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,220 | $1,619 | Implemented |
SU0453 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $325 | $239 | Implemented |