IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 321918 Other Millwork (including Flooring)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0228 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $50 Not Implemented
UA0228 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $164 $419 Not Implemented
UA0228 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,337 $1,553 Not Implemented
UA0228 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,664 $11,337 Not Implemented
UA0228 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $8,116 $100 Not Implemented
UA0127 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $220 $790 Implemented
UA0127 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,119 $9,967 Not Implemented
UA0127 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,739 $6,195 Implemented
UA0127 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $1,500 Implemented
UA0127 # 04 Y:2014 04 2014 MODIFY STARTUP/SHUTDOWN TIMES $11,493 $0 Not Implemented
UA0127 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,037 $28,162 Not Implemented
UA0127 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $1,431 $95 Not Implemented
UA0127 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $156 $116 Not Implemented
UA0127 # 08 Y:2014 08 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,469 $40,000 Implemented
UA3028 # 04 Y:2013 04 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $16,926 $2,300 Not Implemented
UA3028 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,215 $5,595 Implemented
UA3028 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,021 $6,562 Not Implemented
UA3028 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,307 $1,000 Not Implemented
UA0038 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,021 $1,018 Not Implemented
UA0038 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,118 $0 Implemented
UA0038 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,713 $3,000 Implemented
UA0038 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $263 $0 Implemented
UA0038 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,302 $58,596 Not Implemented
UA0038 # 05 Y:2009 05 2009 USE PHOTOCELL CONTROLS $1,324 $1,394 Implemented
UA0038 # 06 Y:2009 06 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,493 $6,000 Not Implemented