Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 321999 | All Other Miscellaneous Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0767 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,428 | $5,428 | Not Implemented |
OR0767 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,167 | $14,238 | Not Implemented |
OR0767 # 03 Y:2023 | 03 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $300,390 | $200,000 | Implemented |
OR0767 # 02 Y:2023 | 02 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $172,773 | $37,200 | Implemented |
OR0767 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,793 | $0 | Not Implemented |
OR0699 # 05 Y:2018 | 05 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $592 | $10,650 | Not Implemented |
OR0699 # 04 Y:2018 | 04 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $6,151 | $23,153 | Implemented |
OR0699 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,314 | $3,982 | Implemented |
OR0699 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,077 | $2,087 | Not Implemented |
OR0699 # 01 Y:2018 | 01 | 2018 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $4,167 | $1,495 | Implemented |
OR0663 # 03 Y:2015 | 03 | 2015 | REDUCE EXCESS STEAM BLEEDING | $1,876 | $1,768 | Not Implemented |
OR0663 # 05 Y:2015 | 05 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,497 | $24,955 | Not Implemented |
OR0663 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,563 | $63,189 | Not Implemented |
OR0663 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $11,122 | $6,541 | Not Implemented |
OR0663 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $1,318 | $1,010 | Not Implemented |
OR0616 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $750 | Implemented |
OR0616 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $2,727 | $11,025 | Not Implemented |
OR0616 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $6,100 | Implemented |
OR0616 # 01 Y:2013 | 01 | 2013 | INSTALL SENSORS TO DETECT DEFECTS | $145,630 | $200 | Implemented |
OR0575 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,800 | $0 | Not Implemented |
OR0575 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $4,280 | $2,630 | Not Implemented |
OR0575 # 06 Y:2011 | 06 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,994 | $16,460 | Not Implemented |
OR0575 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,400 | $7,692 | Not Implemented |
OR0575 # 04 Y:2011 | 04 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,389 | $948 | Implemented |
OR0575 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,748 | $3,023 | Implemented |